01
PSS (Up to 400 kV – AIS & GIS)
We design ,construct and commission AIS and GIS Pooling substations up to 400 kV Voltage level . Our GIS/AIS Pooling substation works—including Installation and commissioning of MV,HV and EHV equipments and providing suitable protection, automation,communication equipments for safe and reliable load transfer to grid substation which complies with latest state utility/central utility/CEA guidelines.
02
EHV Transmission Lines (Up to 400 kV)
We build high-voltage transmission lines that ensure safe, efficient power transfer over long distances.
Kshema specialises in EHV Transmission line construction—from route surveys to Line charging (tower spotting,Land Row,foundation construction, tower erection, conductor & OPGW stringing, Tower earthing etc..) for wind and solar developers.